You don't have javascript enabled. Good luck with that.
Pencarian
Bangun Tempat Langsir, MRT Tunggu Kesiapan Lahan

Lebak Bulus MRT Railway Project Still Waiting Buildings Demolishment

Because of unavailable empty land, until today, the plan of a train railway construction in Lebak Bulus, South Jakarta projected by PT Mass Rapid Transit (MRT) is not yet realized. Yet, it will be realized after the land is ready.

The construction is waiting for the buildings demolishment in Lebak Bulus from Local Government

MRT to Parse Traffic Jam Better, Ahok Says

“The construction is waiting for the buildings demolishment in Lebak Bulus from Local Government,” said Director of PT MRT Jakarta, Dono Boestami when being contacted, Friday (6/5).

According to Boestami, the land for MRT construction should already be submitted in December 2013. But in fact, there is a land that has not been acquired on Jalan Fatmawati that earmarked for station. But it does not hamper the construction at all.

“But, there is no land acquisition along the main railway, except for some stations only,” he explained.

The train railway in question is the railway that designed from train station to depot. It is because the MRT railway is at the top, while its depot in underground. As planned, there would be two railways in the project and is targeted to complete in 2017.

As known, the National Police had granted a 1.2-hectare land to support the MRT construction on Wednesday (6/3). Over that grant, the City Administration is ready to provide them the compensation in form of 60 dorms, bridge as long as 40x8 meters, 2,500- square meters dam and canteen renovation. These compensation will be realized after the data asset collection is done. 

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1504 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1011 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye990 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye791 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye693 personDessy Suciati